The following information shall be required after a Permitted or Conditional Use is approved, and must be received by the Community and Economic Development Department prior to issuance of any building permits:

(1) Revised Site Plan incorporating all preliminary review comments and requirements;

(2) Final Landscape Plan Documentation Package;

(3) Final lighting plan where applicable;

(4) Final Building construction plans;

(5) Complete engineering plans, including final construction drawings for Streets, utilities, drainage and grading and all plans and information required by the City’s adopted Engineering Standards;

(6) Installation of on-site and off-site improvements or satisfactory arrangements concerning bonding as required by this Title; and

(7) As-built plans showing all changes or modifications made from approved plans in the field.