20-3-108. PIPELINE LOCATION.
This section is included in your selections.
At the time of application for a building permit, site plan review or preliminary plat, the applicant shall provide a scaled site plan that shows the location of any pipeline within 100 feet of the applicant's site. The elevation of the pipeline shall be shown in a site plan and on a grading plan, when such plan is required to be submitted.