Skip to main content
Loading…
This section is included in your selections.

Prior to the issuance of a Storm Water Management Permit for any new development or redevelopment project, a long-term post-construction analysis and Storm Water Management Plan shall be prepared by a civil engineer registered in the State of Utah and submitted to the Division for review and approval. This plan shall include Best Management Practice (BMP) selection, design, installation, operation and maintenance standards necessary to protect water quality and reduce the discharge of pollutants to Storm Water runoff. The Plan shall be prepared in accordance with the Engineering Standards and shall address specific pollutants expected to be generated from the specific site and describe all permanent water quality BMPs to be used on the fully developed site. The type and scope of this Plan will vary with the characteristics of each site. Review and approval of this Plan by the Division is required before any permits are issued that relate to the project.

(Ord. No. 20-32 Repealed & Replaced 08/25/2020)