Skip to main content
Loading…
This section is included in your selections.

The subsurface drainage portion of the Storm Water Management Permit may require, as determined appropriate by the Division, the following restrictions or requirements:

(1) Based on the soils report provided for in this Chapter and any other relevant information available to the Division, a subsurface drainage collection system may be required in order to artificially lower the water table, or the lowest habitable floor elevation of the structure may be limited to an elevation recommended in the soils report; provided, however, that the floor elevation shall be at least three feet above the high ground water elevation.

(2) All development sites shall be graded to provide positive drainage away from all structures so as to prevent any conveying or trapping of water adjacent to the basement and foundation walls of any improvements.

(3) Any Storm Water drainage facilities constructed on the property shall be constructed in accordance with Engineering Division Standards and specifications.

(Ord. No. 20-32 Repealed & Replaced 08/25/2020)