Skip to main content
Loading…
This section is included in your selections.

Any Person developing any area determined to fall within the purview of this Chapter shall, prior to the issuance of a Storm Water Management Permit, submit a comprehensive soil report for review by the Division. The soils report shall define the porosity of the soil and the high and low levels of the water table in the proposed area. The report shall contain an examination of the water table during the period from April through June, or any other time high water table may occur as determined by the Division. All examinations of the property upon which the soils report is based shall have been made within a reasonable time prior to the date of the report. The Division may require the digging of test holes to a depth sufficient to determine the extent of the subsurface water table in the proposed development and any other information required by the Division.

(Ord. No. 20-32 Repealed & Replaced 08/25/2020)