Skip to main content
Loading…
This section is included in your selections.

(1) Concrete inspection permits:

a. Curb and gutter – $0.25/sq. ft. – $50 min. fee.

b. Sidewalk – $0.25/sq. ft. – $50 min. fee.

(2) Excavation permits:

a. Asphalt/concrete cuts/unimproved surface $0.25/sq. ft.

i. Minimum fee for cuts in paved surfaces more than three years old – $150.

ii. Minimum fee for cuts in paved surfaces three years old or less – $250.

b. Minimum fee for unimproved surface cuts $0.25/sq. ft. – $100 min. fee.

c. Miscellaneous work (e.g., debris removal, tree trimming) in public rights-of-way that affects vehicular pedestrian traffic (not including full or partial street closure) $50, plus $50 for each additional week.

(3) Plan review – $50 (fees will be assessed for plan reviews in which the developer or engineer has not made appropriate modifications requested in the previous review).

(4) Property bond processing fee – $2,000.

a. Amendment of original agreement – $200.

(5) Bond fee – $300.

(6) Delay agreement:

a. Commercial – $300.

b. Residential – $100.

(7) Permit extension – $50.

(8) Stop work orders:

a. Stop work order for no permit – 2 x regular permit fee.

b. Other stop work orders – $100.

(9) Road closures:

a. Full road closure, per day:

i. For right-of-way width 66 feet or greater – $500.

ii. For right-of-way width 50 feet – $250.

iii. For right-of-way width 44 feet – $100.

b. Partial road closure, per day:

i. For right-of-way width 66 feet or greater – $250.

ii. For right-of-way width of 50 feet – $125.

iii. For right-of-way width of 44 feet – $50.

(10) Directional bores – $50 + $25/bore pit.

(11) Monthly residential waste collection fee:

a. Single-family dwelling unit with recycling – $15.50.

b. Single-family dwelling unit without recycling – $13.

c. Duplex-family dwelling unit with recycling (per separate dwelling area) – $15.50.

d. Duplex-family dwelling unit without recycling (per separate dwelling area) – $13.

e. Additional garbage container – $9.

f. Additional recycling container $3.

g. Maximum household income allowable to qualify a resident for residential waste collection fee abatement – $12,700.

h. Container return charge – $25.

(12) Limited access facility permits:

a. Access permit – $10.

b. Reimbursement for City constructed improvements – $2.50/sq. ft.

(13) Storm water utility fees (effective January 1, 2011):

a. Rate A: $4 per ERU per month.

b. Rate B: $2.80 per ERU per month.

c. Rate C: $1.80 per ERU per month.

(14) Utility billing penalty charges:

a. $5 late charge per billing cycle.

(15) Fleet maintenance rates for outside agencies:

a. Vehicle maintenance hourly labor rate: $100.

b. Emergency equipment installation hourly labor rate: $75.

c. Parts – cost + 10 percent.

(Ord. No. 93-21 Enacted 07/01/1993; Ord. No. 94-59 Amended 06/22/1994; Ord. No. 94-66 Amended 07/01/1994; Ord. No. 94-92 Amended 09/01/1994; Ord. No. 97-21 Amended 04/07/1997; Ord. No. 97-14 Amended 07/01/1997; Ord. No. 97-30 Amended 07/01/1997; Ord. No. 98-59 Renumbered 08/11/1998; Ord. No. 99-12 Amended 03/23/1999; Ord. No. 99-60 Amended 09/21/1999; Ord. No. 00-15 Amended 03/03/2000; Ord. No. 00-28 Renumbered 04/25/2000; Ord. No. 00-65 Amended 12/19/2000; Ord. No. 01-26 Amended 05/03/2001; Ord. No. 05-21 Amended 05/03/2005; Ord. No. 05-24 Amended 05/17/2005; Ord. No. 05-28 Amended 06/21/2005; Ord. No. 07-65 Amended 10/23/2007; Ord. No. 09-29 Amended 08/31/2009; Ord. No. 10-32 Amended 10/22/2010; Ord. No. 12-27 Amended 06/28/2012; Ord. No. 13-03 Amended 01/21/2013; Ord. No. 14-26 Amended 06/02/2014; Ord. No. 15-25 Amended 08/01/2015; Ord. No. 18-33 § 2 Amended 09/04/2018; Ord. No. 18-36 § 2 Amended 09/25/2018; Ord. No. 19-22 § 2 Added 08/14/2019. Formerly 1-2-108)

* Code reviser’s note: This section was amended at the City’s request in March 2018 to remove an invalid cross-reference.